Installed cotter pin keepers adjacent to pulleys on the aileron and rudder cables. Temp installed vertical stab to fuselage fairing. Organized hardware for mounting ailerons, flaps and elevator. Tightened elevator Push Pull tube forward attach bolt near forward bearing block. Checked spray foam plug in aileron spars- still not quite setup. Will let dry another day before adding lead shot slurry to balance.